ISTQB Dumps, Exam Paper 13: ISEB ISTQB Foundation Software Testing

1.   Given the following definitions and terms, which of the following is correct:

v)  failurew) faultx)  validationy)  white box testingz)  integration testing in the small
q) Tests based on the structure of the softwarer)  Determining correctness of software products for user needs or requirementss) Deviation of software from expected delivery or servicet)  Combining tested components in stagesu) A manifestation of an error in the software
a) v=u, w=s, x=r, y=t, z=qb) v=s, w=u, x=r, y=q, z=tc) v=u, w=s, x=r, y=q, z=td) v=s, w=u, x=r, y=t, z=qe) v=s, w=u, x=q, y=t, z=r
2.   Under what circumstances should you plan to test a purchased (3rd party) package?
a) it should not be necessary if the package is purchased from a reputable supplierb) if you know that the supplier’s testing may be inadequatec) if you suspect that the supplier’s testing may be inadequated) if the package is critical to your own systeme) if the package is very large
3.   Why is business process-based testing useful in acceptance testing?
a) it will find serious business type faultsb) it ensures that non-functional aspects are testedc) it can give confidence that the system will support the businessd) it can reveal discrepancies between the system and what the business wantse) it ensures that end users are involved
4.   A quality attribute is
a) a characteristic of the quality managerb) an aspect of a system that can be measured on a scalec) an aspect of a system that either exists or doesn'td) software that is of very high qualitye) an aspect of the system that cannot be tested
5.   Which of the following statements regarding static testing is false?
a) static testing requires the running of tests through the codeb) static testing includes control and data flow analysisc) static testing includes desk checkingd) static testing includes techniques such as reviews and inspectionse) static testing can give measurements such as cyclomatic complexity
6.   Completion or exit criteria to determine when testing is complete may be defined in terms of:
a) cost or time onlyb) coverage criteria onlyc) coverage criteria or time onlyd) cost, time or coverage criteria onlye) cost, time, faults found or coverage criteria
7.   Integration testing in the large is
a) looking for faults in large componentsb) specifying which components to combine at once and in what orderc) testing large systemsd) testing that systems interface correctly to other systems and networkse) testing interfaces between programs 8.   Which of the following is not a static testing technique?
a)    error guessing
b)    breakthroughs
c)     data Flow analysis
d)    proof reading
e)    inspections

9.   Consider the following statements:
1. alpha testing is performed by customers or representatives from your market2. alpha testing must be performed before Beta testing3. alpha testing is performed at customer sites4. alpha testing should be performed when the software is stable5. alpha testing is performed by customers or representatives at an in-house site
a) All the above are trueb) 1 - 3 are true; 4 & 5 are falsec) 1 & 4 are true; 2, 3 & 5 are falsed) 1, 4 & 5 are true; 2 & 3 are falsee) 4 & 5 are true, 1 – 3 are false
10. Consider the following statements:
1. inspections are the most formal review process2. walkthroughs are seldom found to be useful3. anything that can be reviewed can be inspected4. anything that can be inspected can be reviewed5. reviews are as effective as inspections
a) 1 is true; 2 – 5 are falseb) 1 & 3 are true: 2, 4 & 5 are falsec) 1, 3 & 4 are true; 2 & 5 are falsed) 1 & 4 are true; 2, 3 & 5 are falsee) all are true


Comments

  1. Reeeallly useful information here. Complete gold. Downloaded your exam papers with answers and I'm totally impress with what I'm seeing so far! Really breaks down ISEB Foundation to it's lowest elements.

    Brucey Timons

    ReplyDelete

Post a Comment

Popular posts from this blog

What is LCSAJ Testing?

What is Syntax Testing?

ISTQB Dumps, Exam Paper 15: ISEB ISTQB Foundation Software Testing