ISEB-ISTQB Sample Exam Paper 48

1. Deliverables of test design phase include all the following except (Testing artifacts) a) Test data b) Test data plan c) Test summary report d) Test procedure plan 2. Which of the following is not decided in the test-planning phase? (Testing artifacts) a) Schedules and deliverables b) Hardware and software c) Entry and exit criteria d) Types of test cases 3. Typical defects that are easier to find in reviews than in dynamic testing are: A. deviations from standards, B.requirement defects, C.design defects, D.insufficient maintainability and incorrect interface specifications. E.All of the above. 4. Load Testing Tools (Per. Testing) a) reduces the time spent by the testers b) reduces the resources spent (hardware) c) mostly used in web testing d) all of the above 5. Reviews, static analysis and dynamic testing have the same objective – A.identifying defects. B. fixing defects. C. 1 and 2 D. None 6. Defect arrival rate curve: A. Shows the number of ne...